Molecular Lab & BSL 3 Laboratory, Selangor
Construction Year : 2017
The facility is located in the private healthcare centre. The total built up area of the facility is 180m². The facility was designed and built according to AS/NZS 2243.3:2010 ( Australian/New Zealand Standard ) and MS 1042.3:2015 ( Malaysian Standard ). It has been audited and validated by the Australia Bio Safety Specialist Engineer through the design till the completion.
Recent Posts