Molecular Lab & BSL 3 Laboratory, Selangor

 In

Construction Year : 2017

The facility is located in the private healthcare centre. The total built up area of the facility is 180m². The facility was designed and built according to AS/NZS 2243.3:2010 ( Australian/New Zealand Standard ) and MS 1042.3:2015 ( Malaysian Standard ). It has been audited and validated by the Australia Bio Safety Specialist Engineer through the design till the completion.

Recent Posts
Contact Us

We're not around right now. But you can send us an email and we'll get back to you, asap.

Not readable? Change text. captcha txt