BSL III Tuberculosis Diagnosis Laboratory, University of Malaya Medical Centre (UMMC)
Construction Year: 2009
The facility was built in Microbiology Laboratory and comprises of BSL II and BSL III. The total built up area of facility is 53m². The facility was designed & built with the collaboration of consultation and accredited to Australian & New Zealand Standard AS/NZS 2243.3.2009 . It is historically recognised as the 1st BSL III built complete with Assurance and Accreditation in Malaysia.
Recent Posts